Lord Street, Redcar, TS10 3ER
Charging costs: 50 kW: £1.00 fee then £0.30p per kWh. 22 kW: 50p fee then 30p per kWh.. Operated by Independent. Find connector types, kW speeds and live availability on Fuelsave.
Network operator: Independent